Register
ukr RUS
 
 / Services for agriculture  / Plot, garden: services  / Complex clearing plots  / Cleaning of the plot Kyiv. Cleaning of country plots...
I will provide a service
Cleaning of the plot Kyiv. Cleaning of summer cottages. Site clearing for construction., Kyiv
Уборка участка Киев. Уборка дачных участков. Расчистка участка под строительство.
I will provide a service

Site cleaning Kyiv. Cleaning of summer cottages. Land clearing for construction., Kyiv

Region: Kyiv
Archived advertisement
Find similar ones
Cleaning of summer cottages, tree removal.
Seasonal cleaning is the cleaning of an area that has its own characteristics at different times of the year.Services of our company include a whole list of seasonal cleaning works, both in autumn and spring, and in winter and summer. Seasonal cleaning is, first of all, the services of gardeners and laborers, site cleaning, cleaning of sites, cleaning of sites, cleaning after tree cutting, planning after grubbing of stumps, tree cutting in Kyiv and the region, forest cutting, tree felling, tree pruning, stump grubbing, tree crowning, tree cutting, removal of emergency trees, forest cutting, forest removal.

In winter, we offer complex snow removal from the territory.

Clearing snow by hand and by mechanisms.

Cleaning the ice.

Loading and export of snow and ice to Kyiv.

Cleaning roofs from snow.

Quality cleaning of the territory of Kyiv.

The clearing of territories and their preparation for construction should begin with the preliminary marking of the site. The land clearing itself can take from several hours to several months, but in any case it requires professional actions.

The sequence and time of work when clearing a forest area with the subsequent construction of various structures on it depends on many factors. Among the main factors influencingcost of site clearing, the initial condition of the site, its dimensions, types of work and the possibility of free access of special equipment are highlighted.
Types of work during the preparation of land plots for development and construction.

Complex works on clearing areas from woody and shrubby vegetation (felling (removal) of trees, sanitary and shaping pruning of trees, rejuvenating pruning of trees, pruning of dry branches, trimming of bushes)
Complete cleaning of the site from household waste
Removal of large stones and boulders
Disassembly ordismantling completed and constructed (dismantling masonry, columns, columns)
Uprooting of stumps, growths, bushes
Shredding of logging residues after logging, when clearing riverbeds from fallen trees, when eliminating the consequences of fires and hurricanes
Tree saw for firewood
Mowing grass(//tractor-service.com)
Planning and layout of the site
Soil development

After receiving all construction permits, we clear the site of excess vegetation.

The first stage is the clearing of the first tier, namely the cutting and felling of small and medium-sized bushes. The second stage is the felling of tree-like shrubs. When the lower layer of the undergrowth is cleared, you can start removing large adult trees.

Clearing the territory of trees can be done with the cutting of trees on the spot and the subsequent removal of logs, or with the cutting of fallen trees on the side. The company's specialists have extensive experience in tree removal - from felling trees in the direction of the natural slope or felling them with the help of a pulling rope, removing a tree in parts with or without the possibility of dropping its fragments, to removing an emergency dangerous tree with the need to hang its parts on the top or on neighboring trees. In principle, if the borders of the plot allow, and there are no obstacles on the plot itself, then the removal of trees with debris to the side can be carried out immediately without clearing the canopy. If it is not possible to remove trees with debris on the site, felling of trees is carried out in parts.
Preparation of the site for development

occupied by buildings, must begin with the removal of communications used in the construction process, disconnection of gas supply, water supply, sewage, heat supply, electricity and communication.
Demolition is under construction.

not used in the construction process, they are produced by disassembly and collapse, sometimes they make temporary fastenings of individual structures built during dismantling. Structures located on the territory of the construction site, which can be used as a foreman, premises for heating workers, drying clothes, huts, etc., are demolished after the completion of the construction.

During demolition, wooden structures are disassembled into elements for the purpose of further use of useful wood. During disassembly, each detachable element must be previously unfastened and take a stable position. All wood materials affected by household fungus must be stored separately from healthy wood, broken up with a crusher, taken away and burned.

Metal structures during disassembly are unfastened, and then cut with oxygen cutters.

Concrete structures are dismantled in accordance with the demolition scheme, which ensures the stability of the structure as a whole. In the constructions, the reinforcement is preliminarily exposed, the resulting individual blocks are unfastened, the reinforcement is cut and the blocks are broken off. The largest mass of such a block, in accordance with the requirements of safety technology, should not exceed half of the load capacity of the crane at the largest drop of the hook.
Disassembly work

in buildings are performed in the following order. First, plumbing equipment is dismantled: gas stoves, electric stoves, gas-electric water heaters, bathtubs, sinks, radiators, etc., then engineering networks (water pipelines, sewage, gas pipelines, electrical networks), then structural elements (usually from top to bottom): roof, ceilings, partitions, etc.

Separate structural elements (ceilings, partitions, balconies, etc.) are demolished or dismantled in sequence. Those structural elements that are in an unsatisfactory or emergency condition due to heavy physical wear and tear are demolished. In addition, the collapse is used to shorten the period of work. Non-detachable wooden, stone and concrete structures should be demolished by breaking and collapsing.

For the collapse of structural elements, crawler cranes with a "bubble", bulldozers, compressor stations (for powering jackhammers with compressed air) and jackhammers, manual and mechanical winches, electric and chainsaws, axes, nailers, etc. are used.

In the process of disassembly, the delivered construction waste will be loaded and removed by dump trucks from 5 to 18 cubic meters on the body of the dump truck.
More
Ad ID: #171898 (added by a registered user)
Permanent Ad Address: 
Impressions / views for today: ?, total: ?
 
Similar recent ads
Among them there are many interesting ones...
Расчистка участка
Clearing a site1000 hryvnias.
Kyiv region.
20-01-2026
Земляные работы Дарница 3
Kyiv
06-09-2026
ua
/ua/
0