Concreting of Tape Foundation in Kyiv and the Kyiv region with high quality, at moderate prices.
The strip foundation is often used in the construction of various buildings and structures, as its construction is durable, reliable, and relatively simple. A tape-type foundation is chosen for the construction of buildings with basements and basement floors, as well as for the construction of brick and stone fences. Installation of this type of foundation is relatively simple, but still requires knowledge of technologies. If the work is carried out without taking into account technical standards, the quality of the foundation will be low, the foundation of the house will hardly be as strong as it needs to be. This especially applies to concrete works.
Our construction company
provides a service concreting of strip foundations in Kyiv and throughout the Kyiv region. Our specialists carry out work on pouring the tape foundation with high quality, in accordance with technical standards and taking into account the conditions in which the construction will be carried out.
The main stages of concreting the strip foundation.
Direct concrete works are carried out in several stages, taking into account the maximum allowable time for a break between the pouring of concrete layers. But the pouring of the strip foundation includes a whole complex of works, thanks to which the device is of high quality, suitable for loading and operation in various conditions. Our specialists produce concreting of the strip foundation in Kiev in several main stages:
An on-site visit will be made to prepare an estimate and select construction material. Depending on the natural conditions, the depth of the trench and the planned load on the foundation, the right brand of concrete mix is selected.
Preparatory works.
It is necessary to check the condition of dug trenches before pouring the foundation. If the bottom is uneven, the walls are crumbling and they are not even enough, then additional work will be required.
(//tractor-service.com)
If trenches were not dug on your site,
earthworks are being carried out.
The gravel-sand pillow is being installed. It levels the bottom and serves as a solid foundation for further concreting.
Installation of formwork. Usually, for this, wooden shields are used, which are installed strictly in a vertical position, otherwise the future foundation will not fulfill the expected role.
Reinforcement. The strip foundation is a monolithic reinforced concrete device that can withstand large loads from the walls and natural movements of the soil. Foundation reinforcement is performed before concreting.
Warming of the foundation is also done before pouring concrete. A warm non-removable formwork is used as insulation. This protects the foundation from freezing and improves the overall thermal insulation of the house.
The preparation of the concrete mixture and its pouring into the formwork is carried out gradually, in layers 15-20 cm thick.
Waterproofing of the foundation with bituminous mastic, roofing material, and other materials is performed after the concrete mixture has dried.
Back filling of foundation sinuses with sand.
To order the calculation and service of concrete strip foundations in Kyiv or any other settlement of the Kyiv region in our company, leave your message on the site or call us.