Laying of air conditioner highway in Gatnoe, Chabany, Kryukovshchyna, Vyshnevoe, Novoselky.
When carrying out repairs in an apartment, even cosmetic ones, the first thing to think about is the installation of an air conditioner. After all, it is precisely at this stage that it is possible to carry out hidden laying of the route, in which all communications are hidden in a recess in the wall, called a strobe. Either the track is mounted behind the suspended ceiling, of course, before the installation itself.
The laying of highways for the air conditioner should be carried out at the very beginning of the repair in the room. Before laying highways, it is necessary to determine the place
where should the air conditioner and its power be located, since it will depend on which highway should be laid, the technical possibility of laying
highways, the possibility of drainage without a pump. If it is not possible to install a drain for it to work by gravity, it is necessary to determine what
You will use a drainage pump, external or internal.
It is desirable to have an air conditioner on the day of the road construction works. If there is no air conditioner before laying the highway, decide on an external
type of air conditioner with its power and inform the installers, otherwise you can get into a difficult situation (or the highways are laid with a smaller diameter a
this, in turn, will affect the operation of the air conditioner, or the air conditioner has a different shape, for example, the highways for square air conditioners should be
laid much lower than for a conventional air conditioner)
Connecting the power cable to the air conditioner. After that, you can proceed to the construction of the walls under the highway. Wall cladding is not included in the installation price.
conditioner and are negotiated separately.
What is included in the highway bookmark.
1. Determine the place for installing the air conditioner.(//tractor-service.com)
2. Determine the power of the air conditioner.
3. Determine the technical possibility of gravity drainage.
4. Power cable wiring. (this should be done by an electrician)
5. Grooving of walls under highways.
6. Paving of the highway.
After the repair is completed, an external and internal unit is installed in the room, a drainage pump is connected, if any, a full work check
air conditioner.
If you want to get rid of the smell of sewage in the room. Immediately think about installing a siphon for the air conditioner.
A siphon will be needed only for those whose drainage pipe works by gravity in the sewage system, for those who have or will have a drainage pump,
and also those who have a drainage pipe outside do not need such a siphon.
drainage siphon general view
You can get more detailed information by phone or call the master at home.
Call us, we are always happy to help you.
We work seven days a week!
Tel. 067-159-14-65....063-977-32-23
Shop, contacts
Oleschenko Vladimir / отзывы, инфо. / activity evaluation