Reconstruction and full renovation. Construction of the ZAV building on a prepared site with the possibility of deepening at least 1.5 meters. The height of the passages under the bunkers is up to 3.5 meters for loading cars with high sides. ; 2. construction of a landfill pit; 3. Installation of grain cleaning equipment for all stages of cleaning (primary, secondary, calibration) with a capacity of 25 to 150 t/hour; 4. Installation of a grain transport system with a capacity of up to 150 t/h; 5. Installation of the aspiration system; 6. Setting up the complex in all modes of operation.
A team of specialists will quickly go to the place to determine the optimal placement of the complex in the area.