You can fill the void around the house in Chernomorsk, Odesa region at the most affordable prices by contacting us quickly.
Filling the area around the house is one of the final and very important stages of construction. The main function of the embankment is to protect the foundation of the house from sediments falling from the roof and other inflows of water.
As a rule, the gap runs along the entire perimeter of the house and the width of the gap should extend 20-30 cm beyond the overhang of the roof.
Correctly performing all the preparatory work for the filling of the area in Chernomorsk will be carried out by specialists with extensive work experience working at the construction company "AVTOSTROY". By contacting us, you will not have any problems.
(//tractor-service.com)
It is not recommended to perform these works on your own, since the filling of the void around the house in Chernomorsk is a difficult type of concrete work, since even if the deformation joints are made incorrectly, it will crack and be destroyed. Passing water to the foundation.
Welded mesh is quite suitable for reinforcing the gap, but do not forget about deformation seams. It is also worth paying special attention to the slope of the area, the minimum slope of the canvas from the house should be 6 degrees or 2 - 3 cm. On the meter, these measures are necessary for draining water from the house.
The thickness of the patch should not exceed 10 cm. In order not to miss the slopes, I recommend calling a specialist to divide the area into the necessary slopes. The approximate cost of one square meter of ready-made otmotsky fabric is 1,000 hryvnias with material, but as they say, you have to count.
Construction company Avtostroy provides
services for all types of concrete works in the city of Chernomorsk, Odessa region. We fill the void around the house at the most affordable prices. Contact us right now and our specialists will perform the task efficiently, and our company will also provide a specialist to visit the site for the correct division of the site according to the slopes and the preparation of the estimate absolutely free of charge.
The approximate time of completion of work is from two to five days, also the company's specialists independently purchase and deliver all the necessary materials to the object at the lowest prices of the dealer. activities